User Tools

Site Tools


career_network:deployment

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
career_network:deployment [2022/03/01 10:48] zitaocareer_network:deployment [2022/03/01 11:24] (current) zitao
Line 1: Line 1:
-===== Spring 2022 =====+==== Spring 2022 ====
  
-== Feb. 28 - Meeting ==== +== Feb. 28 ==== 
-  * AttendeeYang, Chengyue, Zitao +  * STEP
-  * Get Zitao in sync with deployment team.  +  * ONGOING: 
-  * Event: Xu@市委 mounted a Kylin PC(internet available) in a307 for us. Shenzhen lockdown, only Yang could enter 市委.+    - Get Zitao in sync with deployment team.  
 +  * TODO 
 +    - Make Kylin PC@市委 remotely available(portable WiFi & 向日葵) 
 +  * EVENT:  
 +      - Xu@市委 mounted a Kylin PC in a307 for us.  
 +      - Shenzhen COVID lockdown.
  
-== Mar. 1 - Meeting ==== +== Mar. 1 ==== 
-  * AttendeeYang, Chengyue, Zitao +  * STEP
-  * Launch two approaches to rpm testing during Shenzhen COVID lockdown1. test by remote controlling Kylin PC@市委 2. test on emulated Kylin.aarch64 machine on QEMU.+  * ONGOING: 
 +  * TODO: 
 +    - Make Kylin PC@市委 remotely available(portable WiFi & 向日葵) 
 +    - test rpm remotely on Kylin PC@市委. 
 +    - test rpm on emulated Kylin.aarch64 machine using QEMU.
career_network/deployment.1646149733.txt.gz · Last modified: 2022/03/01 10:48 by zitao